ANALISA PENGENDALIAN BIAYA DAN WAKTU DENGAN METODE KONSEP NILAI HASIL PADA PROYEK PEMBANGUNAN GEDUNG SATPOL PP KABUPATEN MAJALENGKA

J-ENSITEC

View Publication Info
 
 
Field Value
 
Title ANALISA PENGENDALIAN BIAYA DAN WAKTU DENGAN METODE KONSEP NILAI HASIL PADA PROYEK PEMBANGUNAN GEDUNG SATPOL PP KABUPATEN MAJALENGKA
 
Creator Irawan, Jahar; Program Studi Teknik Sipil, Fakultas Teknik, Universitas Majalengka
Rijaluddin, Arief; Program Studi Teknik Sipil, Fakultas Teknik, Universitas Majalengka
Juliar, Eka; Program Studi Teknik Sipil, Fakultas Teknik, Universitas Majalengka
 
Subject civil engineering
 
Description The success of a project can not be separated from a series of activities that include the stages of planning, implementation and supervision, so that the goals set can be achieved. In an effort to succeed in a construction project, a good technique or management method is needed to improve efficiency, productivity, and quality of work. In connection with that, it is necessary to carry out supervision and control measures in all sectors, especially control of costs and time.This research was conducted at the Majalengka Regency Satpol PP Building Project which aims to determine the project's time performance and the estimated cost and time of the building construction project and the method of concept of the value of the results is effective or not. The data used in this study is the Time Schedule, Cost Budget Plan, and weekly progress reports. From these data can produce BCWP and BCWS values. ACWP, with the help of Microsoft Excel, obtained CP, SV, CPI, SPI, and predicts completion of project costs and end times (ETC, EAC and ECD).From the results of the analysis of the time of the construction of the Satpol PP Building in Majalengka Regency until the 22nd week with a budget of Rp. 2,454,849,000, - resulting in a CPI of 1,1000, SPI obtained at 1,0266, EAC value of Rp. 2.23,681,459.98 and ECD amounted to 126, showing the estimated construction completion time of 126 days, which means the project progressed 24 days from the 150 day plan. Keywords: Earned Value Method, BCWP, BCWS, ETC, EAC
 
Publisher Universitas Majalengka
 
Contributor
 
Date 2019-08-22
 
Type info:eu-repo/semantics/article
info:eu-repo/semantics/publishedVersion

 
Format application/pdf
 
Identifier https://jurnal.unma.ac.id/index.php/JE/article/view/1503
10.31949/j-ensitec.v5i02.1503
 
Source J-ENSITEC; Vol 5, No 02 (2019): Mei 2019
2477-359X
2477-359X
10.31949/j-ensitec.v5i02
 
Language eng
 
Relation https://jurnal.unma.ac.id/index.php/JE/article/view/1503/1386
 
Rights Copyright (c) 2019 J-ENSITEC
http://creativecommons.org/licenses/by-sa/4.0
 

Contact Us

The PKP Index is an initiative of the Public Knowledge Project.

For PKP Publishing Services please use the PKP|PS contact form.

For support with PKP software we encourage users to consult our wiki for documentation and search our support forums.

For any other correspondence feel free to contact us using the PKP contact form.

Find Us

Twitter

Copyright © 2015-2018 Simon Fraser University Library