Lessons learned associated with constructability application in a massive housing project

Gaceta Técnica

View Publication Info
 
 
Field Value
 
Title Lessons learned associated with constructability application in a massive housing project
Lecciones aprendidas asociadas a la aplicación de la constructabilidad en un proyecto masivo de viviendas
 
Creator Giménez, Zulay
Briceño, Mariano
 
Description The architecture, engineering and construction industry has great activity and importance, it moves other areas to satisfy the infrastructure needs of most economic and social activities, such as housing, roads, education, industry and health, among others However, it is one of the industries with the lowest productivity and which seems not to have taken advantage, as do other production sectors in general, of the opportunities offered by some management philosophies to solve complications and difficulties. This article analyzes the most relevant lessons learned from the implementation, both in the previous phases and in the link or relations between them, and in the corporate area of the company, when applying the constructablity in the planning stages, design and acquisitions, guiding the objectives of multidisciplinary teams towards the integration of a housing project built in Barquisimeto, Venezuela. The methodology was used in the integral process of the project, prior to the preliminary project, which led to the continuation of benefits in costs, times and quality of the final product in a pilot project
La industria de la arquitectura, ingeniería y construcción posee gran actividad e importancia, ya que impulsa a otras áreas al satisfacer las necesidades de infraestructura de la mayoría de las actividades económicas y sociales, tales como vivienda, vialidad, educación, industria y salud, entre otras. Sin embargo, es una de las industrias que presenta menor productividad y que pareciera no haber aprovechado, tal como lo hacen otros sectores de producción en general, las oportunidades que brindan algunas filosofías de gestión para resolver complicaciones y dificultades. En el presente artículo se analizan las lecciones aprendidas más relevantes de la implementación, tanto en las fases previas como en el enlace o relaciones entre las mismas, y en el área corporativa de la empresa, al aplicar la constructablidad en las etapas de planificación, diseño y adquisiciones, orientando los objetivos de equipos multidisciplinarios hacia la integración de un proyecto de viviendas construido en Barquisimeto, Venezuela. La metodología fue empleada en el proceso integral del proyecto, previo al anteproyecto, lo cual condujo a proseguir beneficios en costos, tiempos y calidad del producto final en un proyecto piloto
 
Publisher Universidad Centroccidental Lisandro Alvarado - Decanato de Ingeniería Civil
 
Date 2019-01-31
 
Type info:eu-repo/semantics/article
info:eu-repo/semantics/publishedVersion
Artículo científico de investigación original
 
Format application/pdf
 
Identifier https://revistas.ucla.edu.ve/index.php/gt/article/view/2086
10.13140/RG.2.2.30211.55847
 
Source Gaceta Técnica; Vol 20 No 1 (2019): January-June; 61-77
Gaceta Técnica; Vol. 20 Núm. 1 (2019): Enero-Junio; 61-77
Gaceta Técnica; v. 20 n. 1 (2019): Enero-Junio; 61-77
2477-9539
1856-9560
 
Language spa
 
Relation https://revistas.ucla.edu.ve/index.php/gt/article/view/2086/1149
https://revistas.ucla.edu.ve/index.php/gt/article/view/2086/1210
/*ref*/M. S. Leong, & P. A. Tilley, «Lean Strategy to Performance Measurement – Reducing Waste by Measuring ‘ Next ’ Customer Needs», Proceedings of the 16th Annual Conference of the International Group for Lean Construction, 757–768, 2008
/*ref*/B. Dave, L. Koskela, M. Kagioglou, & S. A. Bertelsen, «Critical look at integrating people, process and information systems within the construction sector», 16th Annual Conference of the International Group for Lean Construction, 795–808, 2008
/*ref*/B. D, Ilozor, C. O. Egbu, & T. S. Abdelhamid, «Designing and building to minimize construction waste», Proceedings of IGLC16: 16th Annual Conference of the International Group for Lean Construction, 2008
/*ref*/G. Howell, «Uncertainty and contingency: Implications for managing projects», Proceedings for the 20th Annual Conference of the International Group for Lean Construction, 10, 2012
/*ref*/A. Serpell, «Administración de operaciones de construcción» Textos Universitarios, Facultad de Ingeniería, Ediciones Universidad Católica de Chile, Chile, 2002
/*ref*/Construction Industry Institute (CII), «Implementation guide Constructabilit» Publication, 34 (1) 1993
/*ref*/M. Loyola, & L. Goldsack, «Constructividad y Arquitectura», Universidad de Chile, Primera ed, Chile, 2010
/*ref*/J. Espinoza Rosado, & R. M. Pacheco Echevarría, «Mejoramiento de la constructabilidad mediante herramientas BIM» Item type info:eu-repo/semantics/masterThesis, Universidad Peruana de Ciencias Aplicadas, doi:10.13140/RG.2.1.4575.8800, Perú, 2014
/*ref*/Z. Giménez, & C. Suarez, «Procedimiento para la implantación de la constructabilidad en la etapa de diseño preliminar de una empresa promotora de viviendas», Perspectiva. Revista electrónica científica LUZ , 2013
/*ref*/M. Alalawi, S. Johnson, S. Han, Y. Mohammed & AbouRizk «Constructability: Capabilities, Implementation, and barriers», 5th International/11th Construction Specialty Conference, 14, 2015
 

Contact Us

The PKP Index is an initiative of the Public Knowledge Project.

For PKP Publishing Services please use the PKP|PS contact form.

For support with PKP software we encourage users to consult our wiki for documentation and search our support forums.

For any other correspondence feel free to contact us using the PKP contact form.

Find Us

Twitter

Copyright © 2015-2018 Simon Fraser University Library