Peningkatan Ketersediaan Waktu Operasi Pada Mesin Boiler Berdasarkan Down Time Dengan Pendekatan Metode Reliability Centered Maintenance (RCM) (Studi Kasus PT. Dian Swastika Sentosa, Tbk

Jurnal Sinergi Jurusan Teknik Mesin

View Publication Info
 
 
Field Value
 
Title Peningkatan Ketersediaan Waktu Operasi Pada Mesin Boiler Berdasarkan Down Time Dengan Pendekatan Metode Reliability Centered Maintenance (RCM) (Studi Kasus PT. Dian Swastika Sentosa, Tbk
 
Creator Sultan, Ahmad Zubair
Suyuti, Muhammad Arsyad
Naim, Tanhar Bin
Amiruddin, Arya A.
 
Description This study aims to (1) determine the subsystem or component that causes the main failure in boiler unit 2 and the effect on production efficiency. (2) Determine the maintenance interval at boiler unit 2 with the Reliability Centered Maintenance method. This research was conducted by processing downtime data from each sub-system or component, which was converted into time data between failures. Thus, testing of the distribution data is to determine the appropriate distribution. Based on the parameters obtained, it is used to determine the reliability function of each subsystem or component. Thus, the reliability value of each component over a certain period of time can be calculated. From the results of the research, the most damage has reliability including ballmill a (29.01%), ballmill b (37,250%), bottom ash a (41,604%), coal feeder a (35,282%), boiler (38,275%), hydraulic (20,236%), soot blower l3 (16,019%), coal feeder b (35,915%). So that reliability is focused on these components or subsystems. Then the maintenance time intervals are arranged as a group maintenance strategy to achieve the targeted system reliability.
 
Publisher Politeknik Negeri Ujung Pandang
 
Contributor
 
Date 2020-12-12
 
Type info:eu-repo/semantics/article
info:eu-repo/semantics/publishedVersion

 
Format application/pdf
 
Identifier http://jurnal.poliupg.ac.id/index.php/Sinergi/article/view/2630
10.31963/sinergi.v18i2.2630
 
Source Jurnal Sinergi Jurusan Teknik Mesin; Vol 18, No 2 (2020): Oktober 2020; 189-197
Jurnal Teknik Mesin Sinergi; Vol 18, No 2 (2020): Oktober 2020; 189-197
2684-9372
1693-1548
10.31963/sinergi.v18i2
 
Language ind
 
Relation http://jurnal.poliupg.ac.id/index.php/Sinergi/article/view/2630/pdf
 
Rights ##submission.copyrightStatement##
 

Contact Us

The PKP Index is an initiative of the Public Knowledge Project.

For PKP Publishing Services please use the PKP|PS contact form.

For support with PKP software we encourage users to consult our wiki for documentation and search our support forums.

For any other correspondence feel free to contact us using the PKP contact form.

Find Us

Twitter

Copyright © 2015-2018 Simon Fraser University Library