Studi Analisis Dampak Overload Transformator Terhadap Kualitas Daya Di PT. PLN(Persero) Up3 Pondok Gede

KILAT

View Publication Info
 
 
Field Value
 
Title Studi Analisis Dampak Overload Transformator Terhadap Kualitas Daya Di PT. PLN(Persero) Up3 Pondok Gede
 
Creator Samsurizal, Samsurizal
Hadinoto, Benyamin
 
Description The population of the population in big cities, special areas of the big cottage growth continues to increase according to the BPS in 2015 amounted to 2,733,240 and increased in 2019 3,013,851. With an increasing population, it will increase electricity demand in the region. The JS 190 Distribution Station provided a significant increase in transformer loading which achieved a 95.75% loading presentation of a 200 kVA transformer capacity. Therefore it is necessary to improve by looking at these conditions, one of which is by doing an uprating transformer or adding a power transformer with a larger capacity to 400 kVA. From the results of the increase obtained loading results decreased to 52.75% which means the reversal transformer is one method that can be used to overcome the overload.
 
Publisher Sekolah Tinggi Teknik - PLN
 
Date 2020-04-26
 
Type info:eu-repo/semantics/article
info:eu-repo/semantics/publishedVersion
Peer-reviewed Article
 
Format application/pdf
 
Identifier https://stt-pln.e-journal.id/kilat/article/view/784
10.33322/kilat.v9i1.784
 
Source KILAT; Vol 9 No 1 (2020): KILAT; 136 - 142
2655-4925
2089-1245
10.33322/kilat.v9i1
 
Language eng
 
Relation https://stt-pln.e-journal.id/kilat/article/view/784/681
 
Rights Copyright (c) 2020 KILAT
 

Contact Us

The PKP Index is an initiative of the Public Knowledge Project.

For PKP Publishing Services please use the PKP|PS contact form.

For support with PKP software we encourage users to consult our wiki for documentation and search our support forums.

For any other correspondence feel free to contact us using the PKP contact form.

Find Us

Twitter

Copyright © 2015-2018 Simon Fraser University Library